Total Piles
0
Piles Completed
0
Piles Remaining
0
Active Rigs
0
Avg Production (6WD)
0
Est Completion
—
Production Chart
Live
Daily Piles
Daily
Cumulative Actual
Planned
Executed Piles Matrix
CW
| CW / Date | ID | Lm | m3 |
|---|
Gross Duration
Average duration by day or CW
hrs
Drilling Duration
Average duration by day or CW
hrs
Cage Duration
Average duration by day or CW
hrs
Pouring Duration
Average duration by day or CW
hrs
Over Consumption
Average by day, CW, or pile
%
Over Excavation
Average by day, CW, or pile
m
Daily Manpower Matrix
Daily manpower by role
Day
| Date | PM | Engineers | Foreman | Operator | Vibro | Riggers | Welder | Mechanic | Helpers | Total |
|---|
Daily Manpower Histogram
Nos
Project Equipment Matrix
Daily equipment by ownership and type
Fleet
| Date | Fleet | Summary |
|---|
Daily Equipment Histogram
Nos
Daily Rig Utilization Matrix
Drilling utilization by rig based on a 12 hr shift
12 Hr
| Date | Rig | Drilling Hr | Drilled Lm | Shift Hr | Rig Util. | Day Total |
|---|
Rig Utilization
Daily and cumulative utilization by rig
Daily
Manpower Matrix
Employee comparison by designation and project
Loading manpower roster...
Headcount by Project
Nos
Headcount by Designation
Nos
Project x Designation Heatmap
Timing Analysis
Pile activities timeline filtered by selected period and pile
All Piles
Pile Activity Durations
Durations for current filtered scope
All Piles
| ID | Length | Drilling | Cage | Pouring | Gap 1 | Gap 2 | Gross |
|---|
Average Activity Durations (hr) / %
Current filtered scope
0 piles
0.0
Gross Hr
Drilling
Gap 1
Cage
Gap 2
Pouring
Consolidated Cost Report
Weekly execution cost breakdown based on active site allocations
CW
| CATEGORY / WEEK | Week 10 | Week 11 | Week 12 | Week 13 | TOTAL |
|---|
Weekly Cost Trends
Cost progression by group
Cost by Category (AED)
Cost per Executed Lm (AED/Lm)